top of page

DB 10 JAHRE BERLIN HBF

For the 10th anniversary of the Berlin main station, we worked with Deutsche Bahn. We designed large parts of the floors inside the main station with straight tape lines in different colors. The lines formed an abstract system on the floor as well as on the stairs. On two levels we connected the straight lines on the floor with a unique structure on a wall. On the front – the main entrance of the main station – we worked with hydraulic lifts to reach the highest point of the structure at approximately 25 meters. For this tape artworkwe used colored tapes that had a width of 30cm. The lines form an abstract interpretation of a network. We decided to implement highlights with translucent tape. This effect could be especially seen at night time.

bottom of page